Why SCMD?
COMPARASION OF CONSTRUCTION DELIVERY METHODS
TRADITIONAL PROjECT DELIVERY
POSSIBLE RE-DESIGN 
image.png
image.png
image.png
COST
ESTABLISHED
BID
CONSTRUCTION
DETAIL
DRAWINGS
PRELIMINARY
DRAWINGS
image.png
image.png
image.png
DETAIL
DRAWINGS
PRELIMINARY
DRAWINGS
CONSTRUCTION
SCMD PROjECT DELIVERY
20% SAVINGS OVER TRADITIONAL METHOD
COST
ESTABLISHED
image.png

COST SAVINGS

We ensure cost savings through the careful use of materials, value engineering, and cost-efficient construction processes. You will also know your project cost earlier in the design process.

image.png

TIME SAVINGS

With the SCMD team involved from the start of the design process to the final walk-through, we can complete many steps simultaneously.

image.png

HASSLE-FREE PROCESS

With the traditional method, owners must manage two (or more) separate contracts in which the owner becomes the middleman, settling disputes between the designer and the contractor. At SCMD you only have to deal with us because we provide all of those services in-house. Together, we work with you to develop the project's goals, budget, and construction schedule.

COMPARASION OF CONTRACTUAL RELATIONSHIPS
TRADITIONAL PROjECT DELIVERY
image.png
GESP1.png
image.png
image.png
image.png
OWNER
DESIGNER
CONTRACTOR
SUBCONTRACTORS
SUBCONTRACTORS

Owner must manage two separate contracts; owner becomes the middleman, settling disputes between the designer and the contractor. Designer and contractor can easily blame one another for cost overruns and other problems.

VS
SCMD PROjECT DELIVERY
OWNER
 
DESIGN-BUILD TEAM
SUBCONTRACTORS

Owner manages only one contract with single point of responsability; designer and contractor are on the same team, providing unified recommendations. Changes are adressed by the design-build team and not used as excuses. The design-build team manages all subs and consultants.